Phase 33 — Grounded Verbalization #224

Closed
toasterson wants to merge 3 commits from claude/wi-019db054-phase-33-grounded-verbalization into develop
Owner

Draft PR for Anima work item Phase 33 — Grounded Verbalization (019db054-8a0e-79d3-8731-670f9449dd3a).

This PR is a scaffold opened by anima-triage. The implementation worker picks it up from here.

Close or mark ready manually once the implementation lands.

Draft PR for Anima work item **Phase 33 — Grounded Verbalization** (`019db054-8a0e-79d3-8731-670f9449dd3a`). This PR is a scaffold opened by `anima-triage`. The implementation worker picks it up from here. - Marker: [`.anima/wip/019db054.md`](.anima/wip/019db054.md) - Current phase: `implementing` Close or mark ready manually once the implementation lands.
feat: Phase 33 — Grounded Verbalization (019db054)
Some checks failed
CI / check-seshat (pull_request) Failing after 2h4m24s
CI / publish-chart (push) Failing after 2h4m46s
CI / check-seshat (push) Failing after 2h4m55s
CI / docker-seshd (push) Failing after 2h5m3s
CI / docker-seshd (pull_request) Failing after 2h5m7s
CI / publish-chart (pull_request) Failing after 2h5m17s
877fc80ebe
wip: triage Phase 33 — Grounded Verbalization
Some checks failed
CI / check-seshat (push) Failing after 2h4m55s
CI / check-seshat (pull_request) Failing after 2h0m0s
CI / docker-seshd (push) Failing after 2h0m0s
CI / publish-chart (push) Failing after 2h0m0s
CI / docker-seshd (pull_request) Failing after 2h0m1s
CI / publish-chart (pull_request) Failing after 2h0m1s
1600b5255d
wip: triage Phase 33 — Grounded Verbalization
Some checks failed
CI / publish-chart (push) Failing after 1m9s
CI / check-seshat (pull_request) Failing after 1m27s
CI / docker-seshd (pull_request) Failing after 1m25s
CI / publish-chart (pull_request) Failing after 1m17s
CI / docker-seshd (push) Failing after 9m44s
CI / check-seshat (push) Failing after 9m52s
fa531ec065
Author
Owner

Left open during the 2026-06-02 integration pass (48 of 50 open PRs merged to develop + main). This branch is not integrable as-is: the commit is titled "Phase 21 — Game-Theoretic Social Reasoning" on a Phase 33 — Grounded Verbalization branch (internally mislabeled), and the diff is 178 files / +33,680 / −7,102 vs develop. The ~7k deletions would revert/rewrite large parts of the 48 PRs just integrated, across nearly the whole tree. Recommendation: rebase onto current develop and re-cut as focused, correctly-labelled PRs. See docs/ai/2026-06-02-pr-integration-report.md and docs/ai/plans/2026-06-02-gemma-vsa-pipeline-gap-analysis.md.

Left **open** during the 2026-06-02 integration pass (48 of 50 open PRs merged to `develop` + `main`). This branch is **not integrable as-is**: the commit is titled "Phase 21 — Game-Theoretic Social Reasoning" on a *Phase 33 — Grounded Verbalization* branch (internally mislabeled), and the diff is **178 files / +33,680 / −7,102** vs develop. The ~7k deletions would revert/rewrite large parts of the 48 PRs just integrated, across nearly the whole tree. **Recommendation:** rebase onto current `develop` and re-cut as focused, correctly-labelled PRs. See `docs/ai/2026-06-02-pr-integration-report.md` and `docs/ai/plans/2026-06-02-gemma-vsa-pipeline-gap-analysis.md`.
toasterson changed title from WIP: Phase 33 — Grounded Verbalization to Phase 33 — Grounded Verbalization 2026-06-02 12:31:18 +00:00
toasterson changed title from Phase 33 — Grounded Verbalization to WIP: Phase 33 — Grounded Verbalization 2026-06-02 12:31:38 +00:00
toasterson changed title from WIP: Phase 33 — Grounded Verbalization to Phase 33 — Grounded Verbalization 2026-06-02 12:48:10 +00:00
Author
Owner

Integrated (focused subset) and closing. The coherent substantive content of this branch — Phase 21 src/agent/game_theory.rs (+598) plus the grammar enhancements (abs/discourse/lexer/mod/narrative/parser/rust_gen/templates, ~11 files) — was integrated into develop+main via per-file 3-way merge. The ~167 incidental stale-base rewrites and the .anima-exec/ runtime junk were intentionally discarded. Full-feature build green; lib tests 2412 passed / 0 failed (+19 from this work). src/grammar/equivalences.rs kept the already-merged superset. (equivalences note + record: docs/ai/2026-06-02-pr-integration-report.md.)

**Integrated (focused subset) and closing.** The coherent substantive content of this branch — Phase 21 `src/agent/game_theory.rs` (+598) plus the grammar enhancements (`abs/discourse/lexer/mod/narrative/parser/rust_gen/templates`, ~11 files) — was integrated into `develop`+`main` via per-file 3-way merge. The ~167 incidental stale-base rewrites and the `.anima-exec/` runtime junk were intentionally discarded. Full-feature build green; lib tests 2412 passed / 0 failed (+19 from this work). `src/grammar/equivalences.rs` kept the already-merged superset. (`equivalences` note + record: `docs/ai/2026-06-02-pr-integration-report.md`.)
toasterson closed this pull request 2026-06-02 13:55:46 +00:00
Some checks failed
CI / publish-chart (push) Failing after 1m9s
CI / check-seshat (pull_request) Failing after 1m27s
CI / docker-seshd (pull_request) Failing after 1m25s
CI / publish-chart (pull_request) Failing after 1m17s
CI / docker-seshd (push) Failing after 9m44s
CI / check-seshat (push) Failing after 9m52s

Pull request closed

Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
toasterson/akh-medu!224
No description provided.